Documents
Documents
Here you will find relevant documents relating to the project, including community newsletters, public exhibition information and the Environmental Impact Assessment documents submitted to the planning authorities.
Supplementary Environmental Information Documents - August 2026
-
Supplementary Environmental Information - Volume 1 - Cover Page and Table of Contents
Supplementary Environmental Information - Volume 1 - Chapter 1 - Introduction
Supplementary Environmental Information - Volume 1 - Chapter 2 - Proposed Development Description
Supplementary Environmental Information - Volume 1 - Chapter 3 - Site Selection and Design Iteration
Supplementary Environmental Information - Volume 1 - Chapter 5 - Planning and Energy Policy Context
Supplementary Environmental Information - Volume 1 - Chapter 7 - Ornithology
Supplementary Environmental Information - Volume 1 - Chapter 8 - Ecology
Supplementary Environmental Information - Volume 1 - Chapter 10 - Cultural Heritage
Supplementary Environmental Information - Volume 1 - Chapter 11 - Access Traffic and Transport
Supplementary Environmental Information - Volume 1 - Chapter 12 - Noise
Supplementary Environmental Information - Volume 1 - Chapter 13 - Aviation
Supplementary Environmental Information - Volume 1 - Chapter 14 - Other Issues
-
Supplementary Environmental Information - Volume 2 - Cover Page and Table of Contents
Supplementary Environmental Information - Volume 2 - Chapter 1 - Figure 1.1 - Site Location
Supplementary Environmental Information - Volume 2 - Chapter 2 - Figure 2.1 - Site Layout
Supplementary Environmental Information - Volume 2 - Chapter 2 - Figure 2.2 - EIA Site Layout
Supplementary Environmental Information - Volume 2 - Chapter 9 - Figure 9.1a - Peat Depth Overview
Supplementary Environmental Information - Volume 2 - Chapter 9 - Figure 9.3 - Geomorphology
-
-
-
-
-
Chapter 2 - Figure 2.7a(1) - Indicative Access Junction Widening A(1) (A9)
Chapter 2 - Figure 2.7a(2) - Indicative Access Junction Widening A(2) (A9)
Chapter 2 - Figure 2.7b - Indicative Access Junction Widening B (B9152)
Chapter 2 - Figure 2.8 - Indicative Cross-Sections of Access Tracks
Chapter 2 - Figure 2.10 - Indicative Batching Plant Compound
Chapter 2 - Figure 2.11 - Indicative Substation Elevation Drawing
Chapter 2 - Figure 2.12 - Internal Make-Up of the Substation
Chapter 6 - Figure 6.2.1 - TA 6.2 - A6.2.1 - Aviation Lighting ZTV - Nacelle Lighting
Chapter 6 - Figure 6.2.2 - TA 6.2 - A6.2.2 - Aviation Lighting ZTV - Nacelle Lighting
Chapter 6 - Figure 6.2.3 - TA 6.2 - A6.2.3 - Aviation Lighting ZTV - Nacelle Lighting - 20km
Chapter 6 - Figure 6.2a - Blade Tip Height 200m - 230m ZTV and Visual Receptors at 45km
Chapter 6 - Figure 6.2b -Blade Tip Height 200m - 230m ZTV and Visual Receptors at 20km
Chapter 6 - Figure 6.3a - Hub Height 118.5m - 148.5m ZTV and Visual Receptors 45km
Chapter 6 - Figure 6.3b - Hub Height 118.5m - 148.5m ZTV and Visual Receptors - 20km
Chapter 6 - Figure 6.4c - Landscape Character Types with Blade Tip Height 200m - 230m ZTV 45 km
Chapter 6 - Figure 6.5a - Designated Landscapes and Wild Land Areas 45km
Chapter 6 - Figure 6.7a - Cumulative ZTV- South-West Group Scenario 1 45km
Chapter 6 - Figure 6.7b - Cumulative ZTV - South-west Group Scenario 2 45km
Chapter 6 - Figure 6.8 - Cumulative ZTV - Corriegarth Group Scenario 1 45km
Chapter 6 - Figure 6.9a - Cumulative ZTV - North-west Group Primary Assessment 45km
Chapter 6 - Figure 6.9b - Cumulative ZTV - North-west Group Scenario 3 45km
Chapter 6 - Figure 6.10a - Cumulative ZTV - North Group Primary Assessment 45km
Chapter 6 - Figure 6.10b - Cumulative ZTV - North Group Scenario 3 45km
Chapter 6 - Figure 6.11 - Cumulative ZTV - Clune Scenario 3 45km
Chapter 6 - Figure 6.12a - Cumulative ZTV - North-east Group Scenario 1 45km
Chapter 6 - Figure 6.12b - Cumulative ZTV - North-east Group Scenario 3 45km
Chapter 7 - Figure 7.1 - Year 1 Vantage Point Locations and Viewsheds and Survey Areas
Chapter 7 - Figure 7.2 - Year 2 Vantage Point Locations and Viewsheds and Survey Areas
Chapter 8 - Figure 8.1a - Nature Conservation Statutory Designations
Chapter 8 - Figure 8.1b - Nature Conservation Non-Statutory Designations
Chapter 8 - Figures 8.3a-d - UK Habitat Classification Survey Results
Chapter 8 - Figures 8.4a-d - National Vegetation Classification Survey Results
Chapter 8 - Figure 8.5a-d - Groundwater Dependent Terrestrial Ecosystems
Chapter 9 - Figure 9.9 - Private Water Supply Risk Assessment
Chapter 9 - Figure 9.10 - Ground Water Dependent Terrestrial Ecosystems
Chapter 10 - Figure 10.3 - Cultural Heritage Viewpoint 1 - Woodend cairn 760m northwest of Woodend
Chapter 10 - Figure 10.4 - Cultural Heritage Viewpoint 2 Inverlaidnan Old House
Chapter 11 - Figure 11.3 - Personal Injury Accidents (PIA) Plan
Chapter 11 - Figure 11.4 - Abnormal Indivisible Load Route Plan
-
Chapter 6 - Figures 6.13a-f - Viewpoint 1 - Carn Glas Choire
Chapter 6 - Figures 6.16a-f - Viewpoint 4 - Meall a’ Bhuchaille
Chapter 6 - Figures 6.21a-f - Viewpoint 9 - B790 near Loch Insh
Chapter 6 - Figures 6.22a-j - Viewpoint 10 - River Dulnain (southern bridge crossing)
Chapter 6 - Figures 6.25a-f - Viewpoint 13 - Carn na Saobhaidhe
Chapter 6 - Figures 6.27a-f - Viewpoint 15 - Beinn Bhreac Mhor
Chapter 6 - Figures 6.29a-f - Viewpoint 17 - A938 Carrbridge Achnahannet Junction
Chapter 6 - Figures 6.30a-f - Viewpoint 18 - Estate track near River Dulnain Allt an Tudair
-
Chapter 6 - Figures 7.4a-e - Viewpoint 4 - Meall a’ Bhuchaille
Chapter 6 - Figures 7.9a-d - Viewpoint 9 - B790 near Loch Insh
Chapter 6 - Figures 7.10a-d - Viewpoint 10 - River Dulnain (southern bridge crossing)
Chapter 6 - Figures 7.13a-d - Viewpoint 13 - Carn na Saobhaidhe
Chapter 6 - Figures 7.15a-d - Viewpoint 15 - Beinn Bhreac Mhor
Chapter 6 - Figures 7.17a-d - Viewpoint 17 - A938 Carrbridge Achnahannet Junction
-
-
Chapter 2 - Technical Appendix 2.1 - Outline Construction Environmental Management Plan
Chapter 2 - Technical Appendix 2.2 - Battery Safety Statement
Chapter 4 - Technical Appendix 4.1 - Highland Wind Farm EIA Scoping Report_Part A
Chapter 4 - Technical Appendix 4.1 - Highland Wind Farm EIA Scoping Report_Part B1
Chapter 4 - Technical Appendix 4.1 - Highland Wind Farm EIA Scoping Report_Part B2
Chapter 4 - Technical Appendix 4.1 - Highland Wind Farm EIA Scoping Report_Part B3
Chapter 4 - Technical Appendix 4.2 - Highland Wind Farm EIA Scoping Opinion
Chapter 4 - Technical Appendix 4.3 - Highland Wind Farm Gatecheck Report
Chapter 4 - Technical Appendix 4.4 - Highland Wind Farm EIA Further Consultation
Chapter 6 - Technical Appendix 6.2 - Aviation Lighting Assessment
Chapter 6 - Technical Appendix 6.3 - Wild Land Impact Assessment
Chapter 6 - Technical Appendix 6.4 - Assessment of Effects on Special Landscape Qualities of CNP
Chapter 7 - Technical Appendix 7.2 - Collision Risk Modelling
Chapter 8 - Technical Appendix 8.1 - National Vegetation Classification Habitat Survey Report_Part A
Chapter 8 - Technical Appendix 8.1 - National Vegetation Classification Habitat Survey Report_Part B
Chapter 8 - Technical Appendix 8.1 - National Vegetation Classification Habitat Survey Report_Part C
Chapter 8 - Technical Appendix 8.3 - Protected Species Survey Report
Chapter 8 - Technical Appendix 8.7 - Outline Peatland Restoration and Habitat Management Plan
Chapter 8 - Technical Appendix 8.8 - Shadow Habitat Regulations Assessment
Chapter 9 - Technical Appendix 9.1 - Watercourse Crossing Schedule
Chapter 9 - Technical Appendix 9.2 - Private Water Supply Risk Assessment
Chapter 9 - Technical Appendix 9.3 - Ground Water Dependent Terrestrial Ecosystem Risk Assessment
Chapter 9 - Technical Appendix 9.5 - Peat Landslide Hazard Risk Assessment_Part A
Chapter 9 - Technical Appendix 9.5 - Peat Landslide Hazard Risk Assessment_Part B
Chapter 9 - Technical Appendix 9.5 - Peat Landslide Hazard Risk Assessment_Part C
Chapter 9 - Technical Appendix 9.6 - Peatland Condition Assessment_Part A
Chapter 9 - Technical Appendix 9.6 - Peatland Condition Assessment_Part B
Chapter 10 - Technical Appendix 10.1 - Heritage Assets within the Inner Study Area
Chapter 10 - Technical Appendix 10.2 - Heritage Assets within the Outer Study Area
Chapter 12 - Technical Appendix 12.1 - Highland Wind Farm Noise Consultation
Chapter 14 - Technical Appendix 14.1 - Carbon Calculator Spreadsheet
-
Community Open Days - November 2024
Community Open Days - April 2024
Scoping Request - March 2024
Highland Wind Farm Scoping Report
Highland_WF_Scoping_Figure 1.2 - Proposed Development Scoping Layout
Highland WF_Scoping_Figure 3.1 - On Site Environmental Constraints
Highland WF_Scoping_Figure 3.2 - Environmental Constraints_10km
Highland_WF_Scoping_Figure 5.1a - Tip Height ZTV 10km and Proposed VPs
Highland_WF_Scoping_Figure 5.1b - Tip Height ZTV 45km and Proposed VPs
Highland_WF_Scoping_Figure 5.2a - Hub Height ZTV 10km and Proposed VPs
Highland_WF_Scoping_Figure 5.2b - Hub Height ZTV 45km and Proposed VPs
Highland_WF_Scoping_Figure 5.4 - Landscape Designations, Wild Land and Tip Height ZTV
Highland_WF_Scoping_Figure 5.6 - Viewpoint 2 A938 Carrbridge Wireline
Highland_WF_Scoping_Figure 5.7 - Viewpoint 5 Cairngorm (Funicular Railway) Wireline
Highland_WF_Scoping_Figure 5.8 - Viewpoint 11 Carn Sgulain Wireline
Highland_WF_Scoping_Figure 5.9 - Viewpoint 14 Strathdearn Wireline
Highland WF_Scoping_Figure 6.1 - Ecology & Ornithology Constraints
Highland WF_Scoping_Figure 8.1 - Site Location and Study Area
Highland WF_Scoping_Figure 9.1a - Cultural Heritage Proposed Development Site - Turbine Area
Highland WF_Scoping_Figure 9.1b - Cultural Heritage Proposed Development Site - Access Area